Williams

  • Project Controls - Houston Tower

  • Spread 15 Pennsylvania

  • Spread 16 Pennsylvania

  • Spread 5 South Carolina, Georgia

  • Spread 4 South Carolina, Georgia

  • 35B30 Valve Replacement

  • Spread 3 Alabama

  • Spread 6 South Carolina, North Carolina

  • Piedmont WS Lee/Cannon Bottom Meter Station South Carolina

  • Sabal Trail, Florida

  • Spread 1 Louisiana, Mississippi, Alabama

  • ST232 Valve Repair

  • DSC Larose Efficiency Bypass

  • ST 200 18" Pipeline Modification/Abandon

  • Repair Atch Rvr Bridge

  • Cal Dive DSV Midnight Star / GOM 25 Mile P/L Lay

  • Witness Welder test

  • Gheens Pipeline Canal Raceland Interconnect

  • 14" Pipeline Abandonment

  • Observe 4” Discovery Gas p/l over Williams 8” p/l in compliance with the Typical Pipeline

  • Cameron Valve-Ville Platte 2” Valve

  • ST 211 (Subsea Tie-in)

  • ST 220 Flushing Project

  • ST 311-A Pipe Bury Barge

  • Lonestar 14” Pipelay

  • ST #124 Jet out and install pig launcher on 8" Walter pipeline

  • Green Canyon #642 Laying out 20" Big Foot Oil Export pipeline

  • Platform inspection @G.I. #115

  • ST 39 Section 17018 Disconnect

  • Working on 6" tie in @ST #232A Platform

  • Working on 8" SSVA

  • MC773-A Devel's Tower

  • Alliance

  • EB-602 Nansen

  • AC-857 Perdido

©2017 Tailing International, LLC. Proudly created with Wix.com