Kinetica

  • Project Management

  • E.I. #175, E.I. #254

  • Burrwood W5 Proposed Piping

  • SS-181-B Back Pressure Valve Replacement

  • SS-149-A Spool Piece Buy Back Spools

  • P&A on Triton Dive Boat

  • Meter Run 11802

  • MC #920 I-HUB

  • Offshore Topside Flushing

  • SM 76

  • WC 171

  • Grand Chenier Jumper Line Const.

  • VR214 12” Riser Repair

  • Patterson Terminal

  • EC 219 VR 217

  • WC 178 SSTI

  • VER12 12”SSTI

  • Pipeline Compliance, Health Safety and compliance manager

  • VR-46 Talos

  • EC BLK-2

  • VR235 SSA 12” Riser Repair

  • WC 172

  • Kinetica Hanger

  • Witness Welders Test

  • Witness Hydrotest

  • DSV Kelly, for SP55A Level ll Inspection, clamp removal & installation work.

  • WD 34-35 8” Abandonment

  • Sabine Pass # 18

  • EI 172 P/L Abandonment

  • Mangrove Bay SSTIA 36" X 8" Hot Tap.

  • Offshore abandonment of Black Elk 8" P/L

  • EC # 129

  • VR 119

  • VR206

  • Fabricating on the SSTIA for Lake Pelto Tap Project.

  • At SS 66 install a SSTIA on 36" P/L.