Enlink Midstream

  • ANR Lecompte Modifications

  • Plaquemine Knockout drum

  • Napoleonville Purities Batching

  • Evangeline gas well connect

  • Spool Pipe Fab & Install

  • Purities Batching

  • Riverside Storage Exp. Riverside Plant

  • Scanning/CAD

  • Cow Island Inlet

  • 30” Floodway Hydro Berwick

  • Ville Platte Regulator Swap

  • Av Isl to Ch Pt ILI 10"

  • Ascension Pipeline 12"

  • White Oak Meter Change Out

  • Plaquemine frac pl seperator

  • Cold Flare Knockout Drum

  • St. Landry Filter Upgrade

  • Enlink/Shintech Expansion

  • Geismar  20" , 12" , 6" Hydro

  • Cow Island #2 Meter Upgrade

  • Hubertville Rd. Project.

  • PelicanPlt to Bridgeline 16 in

  • Liberty Pump Station

  • 6” ANSI 600# Launcher

  • Methanex

  • Belle Rose Interconnect

  • Morganza

  • Starks,Cajun Sibon 12" Leak

  • LLOX Well Connect

  • Leger Interconnect/West Ridge

  • Bridgeline 26 to Av.Isl.10

  • HWY. 70 12" Crossover

  • DOW Plaquemine Plant Mod

  • Purities Project

  • Luling Ditch concrete matting pipeline crossing

  • Methanex Bridgeline Blasting and painting

  • MO-990 Abandonment

  • MO 908A Platform Removal

  • White Castle Dual 10" NGL Pipeline

  • Henry Hub to DIGCO 12"

  • South Scott Trap Extention

  • Targa 4" Connection

  • 2" Meter Tube Replacement

  • Dome to Crossroads dual 10"

  • EPP

©2017 Tailing International, LLC. Proudly created with Wix.com